Thanks to Everyone at Kelsey, Brad’s Towing and BSSC!!
Please Visit the online BSSC Photo Gallery to see more full size pics of the Change House and it’s delivery and installation at the site.
Thanks to Everyone at Kelsey, Brad’s Towing and BSSC!!
Please Visit the online BSSC Photo Gallery to see more full size pics of the Change House and it’s delivery and installation at the site.
The BSSC 2010 Membership Form is now available for download.
Due to technical difficulties we are unable to provide a 2010 Membership Form/Sailing School Form at this time. If you wish to register now, please feel free to use the 2009 Membership Form (available by download from this site) . We hope to have this issue resolved by March 20th, at which time the 2010 forms will be available for download. I apologize for any inconvenience this may have caused anyone, and look forward to seeing you all out on the water this spring. Michele Loewen, BSSC Communications.
Building #1 Design Details: Painted Metal clad roof and wall structure that has a 7.5-10.5’ wall height. Single slant roof that slopes from front high side to back. There will be clear corrugated panel in the high side which faces south and is in the upper section of the wall below the roof. The clear panel will be able to be opened for acting as venting. The building will be on skids on gravel on the ground. It will have two entry doors on the south wall as well as a removable 6’ wide door panel on the West wall allowing entry into the building with boats. The divider wall will be wood and movable to the end of the building for the winter months not being used for changeroom at season closing. Estimated cost for supplies is 3500$.
More information will be posted here as it becomes available. Please consider attending the the AGM in January for additional information and discussion on this issue.